Irishtown Road structure replacement scheduled
Work on the Irishtown Road structure replacement in Burlington will commence on November 2 and is expected to be completed by February 28, 2027.
The current structure has reached the end of its service life.
Traffic:
All traffic will be detoured for the duration of the project, with signage in place to guide motorists along the designated detour route.
Safety:
- Plan ahead to reach your destination on time.
- Reduce speed in the area.
- Remember, speeding and using your phone while driving, even when you’re waiting in traffic, are against the law.
Stay in the loop and plan your route during road construction:
- PrinceEdwardIsland.ca/PlanYourRoute
- Road construction map Prince Edward Island 511
- Follow PEIPublicSafety on Facebook
Media contact:
Dan Hodgson
Department of Transportation and Infrastructure
[email protected]
Published date: