Albany Y structure replacement work resumes May 19

As part of the Albany Y structure replacement, asphalt sealing and site cleanup work will resume at the junction of the Trans-Canada Highway (Route 1) and Route 1A.

 

Dates:

May 19, with work expected to be completed by June 19, 2026.

 

Traffic: 

Traffic will be permitted through the site for the duration of the project. Motorists should expect delays, with traffic controlled by on-site traffic control personnel.

 

Safety:

  • Plan ahead to reach your destination on time.
  • Reduce speed in the area. 
  • Obey flaggers and signs.
  • Remember, speeding and using your phone while driving, even when you’re waiting in traffic, are against the law. 

 

Stay in the loop and plan your route during road construction: 

 

Media contact:
Dan Hodgson
Department of Transportation, Infrastructure and Energy
danmhodgson@gov.pe.ca 

Published date: